Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 16

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 17

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 18

OUR SERVICES

Oil Platforms and FPSO’s

Electrical Front End Engineering Design (electrical FEED) is an important approach to engineering design, adopted before procurement and construction to plan a project in detail and manage costs prior to submitting a tender package to vendors. Electrical FEED is highly cost-effective: in studies, although electrical FEED has accounted for approximately 2% of the total project cost, up to 30% of design and construction costs have been reduced. Electrical FEED is usually carried out after the initial feasibility study (the pre-electrical FEED stage) or conceptual design has been completed. 

(more…)
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 41 ALL SECTORS
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 49
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 53 Warning: foreach() argument must be of type array|object, null given in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 53

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 66

Given the tight deadlines and budget restraints, the level of service Engineering Power Solutions provided was outstanding. The offshore UPS consolidation project was engineered and designed to the platform’s requirements and offshore standards minimising platform shutdowns.

Mr Low – Petrofac Oil&Gas