The G99 grid code was introduced in the UK in April 2019 in response to the growing number of renewable energy sources being connected to the National Grid, superseding the previous G59 grid code. These independently managed sources, such as wind and solar energy devices, can be variable and unpredictable, making it difficult to maintain a stable grid.

(more…)

Given the tight deadlines and budget restraints, the level of service Engineering Power Solutions provided was outstanding. The offshore UPS consolidation project was engineered and designed to the platform’s requirements and offshore standards minimising platform shutdowns.

Mr Low – Petrofac Oil&Gas