Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 16

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 17

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 18

OUR SERVICES
Warning: foreach() argument must be of type array|object, null given in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 27

Last year, the United Kingdom added a record 800MWh of new utility energy storage capacity, as the sector moves closer to adding GWh through 2030 and beyond.

In fact, the United Kingdom’s energy storage pipeline increased by 34.5GW in 2022. In total, 2.4GW/2.6GWh of battery storage sites were connected by the end of the year.

This article discusses the significant growth of the energy storage pipeline over the past year and what to anticipate in the years to come.

Large-scale battery storage facility
(more…)
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 53 ALL SECTORS
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 61
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 65 Warning: foreach() argument must be of type array|object, null given in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 65

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 78

Given the tight deadlines and budget restraints, the level of service Engineering Power Solutions provided was outstanding. The offshore UPS consolidation project was engineered and designed to the platform’s requirements and offshore standards minimising platform shutdowns.

Mr Low – Petrofac Oil&Gas