Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 16

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 17

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 18

OUR SERVICES

Many new EPS clients contact us as in a state of panic because of a major unplanned production outages caused by power loss. However, we have found that these unplanned outages could have been easily avoided. A power system study consists of a series of investigations that are carried out to ascertain that a power system is efficient, reliable, and safe under a range of conditions, both normal and abnormal.

The data that we obtain from a power system study is vital to ensure workplace efficiency and safety; for example, it can be used to minimise damage to critical equipment by optimising the fault-clearing abilities of protective devices, or to calculate the required level of personal protective equipment for different network scenarios.

(more…)
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 41 ALL SECTORS
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 49
Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 53 Warning: foreach() argument must be of type array|object, null given in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 53

Warning: Trying to access array offset on value of type null in /home/sites/engineeringpowersolutions.co.uk/public_html/wp-content/themes/mmd/index.php on line 66

Given the tight deadlines and budget restraints, the level of service Engineering Power Solutions provided was outstanding. The offshore UPS consolidation project was engineered and designed to the platform’s requirements and offshore standards minimising platform shutdowns.

Mr Low – Petrofac Oil&Gas